Bridgewater Nyala Complex Parking

Location:  Westport, CT

Market:  Commercial

General Contractor:  JLL Property Management

Timeline:  March 2022 – December 2023

Services Provided: 

  • Fire Protection
  • Controls
  • Engineering
  • Fabrication

Project Overview

This project included demoing and installing new replacement dry pipe systems in five occupied parking buildings and mechanical room, all designed to meet NFPA#13 requirements. Thirteen dry pipe valves with dual air compressor assemblies were installed in each valve room. Approximately 36,500 feet of sprinkler piping was also installed.